Member Login

Remember me ?       
Reply
Old 07-31-2009, 04:52 PM   #1 (permalink)
 
Status: Senior Member
Join Date: Mar 2009
Location: Spain
Posts: 593



Default Important Go Live Information

Currently the Cameroon internet connection is facing technicaldifficulties.

After applying a security update to the .CM registry server, the root name servers failed to get access to the zone file. The technical team of CAMTEL is currently working on the issue to solve the problem.

***65279;Domains which were applied for during the sunrise period will be connected once the Trademark Certificates have been validated. Due to the overwhelming success of the introduction of the .cm top-level domain, we would like to ask for some patience. The review process will be finished soon and we are sure that we can connect the domains as soon as our technical problems are fixed.

***65279;Registrars will not be charged any money before the technical problems are solved and the domains are connected.

The open registration for .CM domains will be suspended till the issue has been solved.

Source: Home Page - REGISTER.CM
Alfredo is offline   Reply With Quote
Old 08-07-2009, 10:41 AM   #2 (permalink)
 
Status: Senior Member
Join Date: Mar 2009
Location: Spain
Posts: 593



Default Re: Important Go Live Information

The new date for the go live of .CM this Friday, 7th of August 2009.

Source: Netcom.cm
Alfredo is offline   Reply With Quote
Old 08-07-2009, 08:21 PM   #3 (permalink)
 
Status: Senior Member
Join Date: Mar 2009
Location: Spain
Posts: 593



Default Re: Important Go Live Information

Many registrars were confused with the end date of landrush and, thus, failed to submit all the landrush domains before we actually locked down the system. Therefore we have decided to re-open landrush for an additional two weeks, starting on Monday.

Re opening of landrush: 10th August 2009 at 00:00:01 UTC.

Closing of landrush: 23rd August 2009 at 23:59:59 UTC.

***65279;To ensure that all historical domain data will be correctly imported into our system and to avoid mistakes we will lock down our zone for three days after landrush period. Go live will start on the 4th day.

Go Live: 27th August 2009 at 00:00:01 UTC.
Alfredo is offline   Reply With Quote


Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 11:35 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.3.2
2009 ccTLDs.comAd Management by RedTyger
Domain name forum recommended by Domaining.com